After a Sunday afternoon's work, the Mission Control Center set is coming
together.Tables were brought in and power strips attached underneath them.The rubber flooring on this side has been completed.And the lunar mural is now attached to the shelving.Some garbage was taken out, which cleared out a lot of space.But you can see that equipment in this area was left untouched -we'll move that this coming week.

A view from the back looking forward...
This view looks down so that you can't see the open space over theoffice area.

This is actually what the area looks like if you look up.

The lunar mural doesn't cover the entire row of shelving.
We could leave it like that or figure out something else to cover it.

Looking down at the Mission Control Center set from on top of the office area.

Looking down at the whole shop area from on top of the office area.
The ISP racks should be integrated into the story somehow.

Another look at the Mission Control Center set after Sunday's progress.

The Mission Control Center set after Sunday's progress.